The Horse Pond Road water main “construction zone area” has advanced and is slightly north of Noyes Lane thru to Peakham Road. The construction zone area shall be closed to all thru traffic, with the exception of local resident-traffic, school buses and emergency vehicles. Exception vehicles should plan for some degree of delay to allow construction equipment to be safely moved outside of the travel lane.
Police details will be on-site to facilitate vehicle detours and pedestrian traffic. Detour’s will remain in effect during the working hours of 7:30 am-3:30 pm, M-F, thru project end on or about November 15th.
Kindly Note: local traffic passes are intended for use by those directly impacted by the construction zone area. If your home is outside of the construction zone area even if you have been provided with a green-traffic pass, during this phase of the project, you must follow the detour signs. You will not be permitted through the area of construction.
Access to driveways and entranceways will be maintained. In the that event it becomes necessary to block a driveway/entranceway for a short period of time (usually less than 4 hours) our contractor will attempt to contact the home/business owner to coordinate and minimize inconveniences.
Construction schedules are weather permitting and subject to change.
Your safety is our priority and we thank you for your patience.
Questions or concerns regarding this matter may be address by contacting our business office at (978) 443-6602.